Skip to content
WW2 Theatres Theatres of the Second World War
Home / The Western Front / Operation Overlord / Exercise Tiger
American troops landing on a beach in England during Exercise Tiger in April 1944.

Exercise Tiger

22 to 30 April 1944 · Slapton Sands and Lyme Bay · Full-scale rehearsal for Utah Beach

Exercise Tiger was the final full-scale rehearsal for the American assault on Utah Beach. The landing exposed problems in timing, communications and ship-to-shore control. Before dawn on 28 April, nine German S-boats found Convoy T-4 in Lyme Bay. LST-507 and LST-531 were sunk, LST-289 was crippled, and 749 American soldiers and sailors were dead or missing five weeks before D-Day.

U.S. Signal Corps · Library of Congress cph.3c32795 · Public domain · Source

This operation sits inside Operation Overlord, where it appears as a single entry. This page carries it in full.

BACK TO OPERATION OVERLORD
PURPOSE
Utah Beach rehearsalThe final full-scale rehearsal for Force U and the US VII Corps assault
MEN MOVED
Over 30,000Soldiers sent toward embarkation areas from 22 April
CONVOY T-4
Eight LSTsFollow-up troops, vehicles and supplies moving through Lyme Bay
SHIPS LOST
LST-507 and LST-531LST-289 was torpedoed and reached Dartmouth with severe stern damage
DEAD OR MISSING
749551 US Army and 198 US Navy personnel
Marker affiliation Allied Axis Other / contested
Map layers

01 / 19

The Ground

A Devon beach chosen because it looked uncomfortably like Utah

Slapton Sands is a long shingle beach on Start Bay in south Devon. Immediately behind it lies Slapton Ley, a narrow lake and marsh separated from the sea by the beach ridge. That combination resembled the flooded ground behind Utah Beach closely enough for VII Corps to rehearse the assault there.

The exercise stretched well beyond the beach. Troops embarked from ports around Plymouth and the south Devon coast, then approached Slapton by sea. Follow-up LSTs had to move through Lyme Bay before turning toward the exercise area. That made the rehearsal a test of convoy control, escorting, navigation and communications as well as a landing drill.

The attack on Convoy T-4 happened east of the beach, in open water off the Devon coast. The two sunken LSTs still lie in Lyme Bay. Their wrecks are now protected sites and provide a fixed archaeological record of a disaster that unfolded in darkness, cold water and scattered burning fuel.

Command & Decision

Ten Allied commanders from First Army and VII Corps to the naval, engineer and regimental commands that made Tiger work

VII Corps wanted the exercise to reproduce the Utah assault as closely as possible. Raymond Barton therefore used the same regimental combat-team structure planned for Normandy, with engineers, tanks, artillery and support units folded into the landing sequence. The scale was deliberate. Problems discovered in Devon still had several weeks to be corrected.

On 27 April Rear Admiral Don Moon moved the assault hour from 07:30 to 08:30. The change did not reach every unit. Company G of the 8th Infantry came ashore on the original timetable while the rescheduled naval bombardment began. A recent US Army review concludes that the heavy naval guns did not hit the company, although explosions landed close enough to demonstrate how dangerous a last-minute timing change could become.

The convoy attack exposed a second coordination failure. HMS Azalea remained with Convoy T-4, while the intended second escort, HMS Scimitar, was unavailable after damage. Communications between British escorts and American LSTs were also poor. The German S-boats therefore found a slow convoy with limited protection and no common picture of the threat.

Omar N. Bradley
Lieutenant General, US Army

Omar N. Bradley

Commanding General, First US Army

Bradley assigned the new Utah Beach mission to VII Corps and the 4th Infantry Division. On 1 April he ordered Collins to begin planning Exercise Tiger for the final week of the month. After Barton decided the 12th Infantry needed a new commander, Bradley sent Russell Reeder to the division.

US Army Signal Corps · Public domain · Source
J. Lawton Collins
Major General, US Army

J. Lawton Collins

VII Corps commander and Exercise Tiger planner

Bradley ordered Collins to begin planning Exercise Tiger on 1 April 1944. VII Corps used the developing Neptune plan as the framework, making Tiger the closest rehearsal yet for the Utah Beach assault. Collins' headquarters coordinated the 4th Infantry Division, engineer support and the wider corps-level exercise.

US Army Signal Corps · National Archives SC 191143 · Public domain · Source
Bernard L. Montgomery
General, British Army

Bernard L. Montgomery

Allied ground force commander for Overlord

Montgomery was part of the senior command discussion that expanded the Normandy assault to include Utah Beach. He inspected Exercise Tiger at Slapton on 27 April and immediately challenged Barton over the absence of the regimental commanders from the first landing. The exchange exposed a ship-to-shore control problem rather than an infantry decision.

Imperial War Museums TR 2721 · IWM Non-Commercial Licence / expired Crown copyright · Source
Bertram H. Ramsay
Admiral, Royal Navy

Bertram H. Ramsay

Allied Naval Commander-in-Chief, Expeditionary Force

Ramsay held overall naval responsibility for the cross-Channel invasion system Tiger was rehearsing. He inspected the Slapton landing with Montgomery on 27 April. When Montgomery challenged Barton over the delayed regimental commanders, the discussion turned directly to the naval handling that had kept them offshore.

Royal Navy official photographer, C. J. Ware · IWM A 23443 · IWM Non-Commercial Licence / expired Crown copyright · Source
Raymond O. Barton
Major General, US Army

Raymond O. Barton

Commanding, 4th Infantry Division

Barton and his staff turned the draft VII Corps Neptune plan into Field Order No. 1 for Exercise Tiger on 18 April. He watched the landing closely, criticised weak cover and movement, and used the rehearsal to identify failures that still had several weeks to be corrected before Utah Beach.

US War Department · Public domain · Source
Don P. Moon
Rear Admiral, US Navy

Don P. Moon

Naval commander, Force U / Utah assault force

Moon controlled the naval side of the Utah rehearsal. On 27 April he postponed H-hour from 07:30 to 08:30. The change did not reach every ship and unit, producing the dangerous overlap between Company G's landing and the rescheduled naval bombardment. After the convoy disaster he wrote Collins expressing sympathy for the losses.

Official US Navy photograph · NHHC 80-G-250062 · Public domain · Source
James E. Wharton
Brigadier General, US Army

James E. Wharton

Commanding, 1st Engineer Special Brigade

Wharton's brigade was woven through the assault force to clear obstacles, organise the beach and open routes for follow-on troops and supplies. Many of the soldiers carried in Convoy T-4 belonged to engineer and supporting organisations connected with this beach mission, placing his command at the centre of both Tiger's purpose and its losses.

US Army · Public domain · Source
James A. Van Fleet
Colonel, US Army

James A. Van Fleet

Commanding, Combat Team 8 / 8th Infantry

Van Fleet commanded the lead regimental combat team. Because his force would be first ashore at Utah, he demanded unusually intensive amphibious practice. During Tiger he and Tribolet were delayed offshore on a 'free boat', preventing them from reaching the beach early enough to correct problems in their landing teams.

U.S. War Department · Public domain · Source
Hervey A. Tribolet
Colonel, US Army

Hervey A. Tribolet

Commanding, Combat Team 22 / 22nd Infantry

Tribolet had already run his regiment through the Slapton training series called Exercise Mink. For Tiger, Combat Team 22 formed the second major assault wave, tasked with securing a causeway and recovering control of its 3rd Battalion from Van Fleet's lead combat team. Tribolet was delayed offshore with Van Fleet during the landing.

US Army Signal Corps / Signal Corps Archive · Public domain · Source
Russell P. Reeder Jr.
Colonel, US Army

Russell P. Reeder Jr.

Commanding, Combat Team 12 / 12th Infantry

Reeder arrived as the replacement for Col. Harry Henderson after Barton judged the 12th Infantry's recent performance unsatisfactory. In Tiger, Combat Team 12 followed Van Fleet and Tribolet with the task of securing the simulated river crossing. His arrival itself was one of the command changes produced by the final rehearsal period.

US Army, Department of Tactics · Public domain · Source

Ships, Guns & Machines

The equipment of an amphibious invasion met fast attack craft in darkness

The LST was the essential machine of the follow-up force. Its flat bottom and bow ramp allowed tanks, trucks and DUKWs to move directly from ship to beach. Those same ships carried fuel, ammunition and hundreds of men. When torpedoes opened the vehicle decks, fire spread through exactly the cargo needed for an invasion.

The German S-boats were built for the opposite task. Fast, low and difficult to see at night, they could attack with 53.3-centimetre torpedoes and withdraw before heavier escorts could concentrate against them. Nine boats from the 5th and 9th Schnellboot flotillas made contact with the convoy.

The beach exercise brought together DUKWs, tank destroyers, landing craft, engineering vehicles and the tracking needed to move heavy loads over shingle. The equipment photographs below come from Slapton or from the exact ship types involved; where the photograph is only a period type image, the caption says so.

USS LST-507
USS LST-511 off Normandy on 6 June 1944. LST-511 was one of the eight LSTs in Exercise Tiger's Convoy T-4. It is used here as a period image of the same convoy and LST-491 class as the lost LST-507.
U.S. Navy · Public domain · Source

USS LST-507

LST-491 class · about 100 m · 3,698 tons loaded · bow doors and vehicle deck

LST-507 carried nearly 500 US Army personnel as well as trucks, 22 amphibious vehicles and live ammunition. A torpedo struck the auxiliary engine room just after 02:00, cutting electricity and communications. Fires spread through vehicles, fuel and ammunition. Historic England records 202 Army and Navy deaths from the ship.

USS LST-531
USS LST-504 unloading in 1945. It was an LST-491-class tank landing ship, the same class as LST-531. No verified wartime Commons photograph of LST-531 itself was found.
U.S. Navy · Public domain · Source

USS LST-531

LST-491 class · about 100 m · 4,080 tons loaded · 117 ship's company

LST-531 carried hundreds of troops and live ammunition. Two torpedoes hit just after 02:15 and the ship sank within about six minutes. Historic England records 424 Army and Navy deaths. Its wreck remains in Lyme Bay alongside the archaeological story of LST-507.

USS LST-289
LST-289 after returning to England with its stern destroyed during the Exercise Tiger attack.
Navy Medicine / Flickr Commons · No known copyright restrictions · Source

USS LST-289

LST-1 class · 328 ft · about 12 knots · tank deck and bow ramp

A torpedo tore away much of LST-289's stern, yet the ship survived and reached Dartmouth. Its survival shows both the punishment the LST hull could absorb and the vulnerability of a slow landing convoy to fast torpedo craft.

HMS Azalea
Flower-class corvette HMS Azalea during the Second World War.
Royal Navy official photographer · IWM FL 1303 · Public domain, UK Crown · Source

HMS Azalea

Flower-class corvette · convoy escort · 16 knots · 4-inch main gun

Azalea was the escort that remained with Convoy T-4. A Flower-class corvette was designed for escort work rather than chasing fast S-boats. The convoy had expected a second warship, leaving Azalea with a difficult task once the torpedo boats appeared.

HMS Scimitar
HMS Scimitar underway during the Second World War.
Royal Navy official photographer · IWM FL 5410 · Public domain, UK Crown · Source

HMS Scimitar

S-class destroyer · intended convoy escort · First World War design

Scimitar was intended to provide the convoy's heavier second escort but was unavailable after damage. A replacement did not reach the convoy before the attack. That left the slow LST formation with less protection than planned.

Kriegsmarine Schnellboot
A Type S 38 Schnellboot taking torpedoes aboard. This period image illustrates the German fast-attack craft family rather than an identified Tiger boat.
Bundesarchiv Bild 101II-MW-1913-31 / Vorländer · CC BY-SA 3.0 DE · Source

Kriegsmarine Schnellboot

5th and 9th flotillas · nine boats · 53.3 cm torpedoes · 40+ knots

The attackers were the craft the Allies called E-boats: diesel-powered Schnellboote built for high-speed torpedo attacks in coastal waters. Their speed and low silhouette made them difficult targets at night. Nine boats from two flotillas took part in the Lyme Bay action.

DUKW
A DUKW beside a truck-mounted crane at a Slapton Sands POL dump during April 1944 training.
US federal government photograph · Public domain · Source

DUKW

6×6 amphibious truck · 2.5-ton truck chassis · ship-to-shore cargo carrier

The DUKW carried men, ammunition, fuel and supplies directly from ships through the surf and onto roads inland. Slapton allowed the engineer and logistics units to rehearse exactly this transition. LST-507 was carrying 22 amphibious vehicles when it was torpedoed.

M10 Gun Motor Carriage
M10 tank destroyer Bessie during an April 1944 landing exercise at Slapton Sands.
PhotosNormandie / Conseil Régional de Basse-Normandie / National Archives USA · CC BY-SA 2.0 · Source

M10 Gun Motor Carriage

Tank destroyer · 3-inch gun · open turret · deep-wading preparation

Tank destroyer units practised unloading heavy tracked vehicles over the same shingle beach that would test the assault force's landing equipment. The surviving Slapton photograph shows an M10 named Bessie beside other vehicles, landing craft and LST-325.

40 mm Bofors L/60
LST-325 and LST-388 unloading off Normandy on 12 June 1944. The photograph clearly shows the single 40 mm Bofors mounts carried by wartime LSTs.
U.S. Navy / National Archives · Public domain · Source

40 mm Bofors L/60

Automatic cannon · shipboard anti-aircraft and surface fire · 40 mm

The LSTs were not helpless transports. Their 40 mm and lighter 20 mm guns could engage surface targets, and surviving ships fired as the S-boats crossed their arcs. In darkness against fast, low craft, those weapons were defensive rather than a substitute for destroyer escort.

M4 Sherman with deep-wading gear
M4 Shermans of the 741st Tank Battalion loaded in an LCT in southern England before Normandy. Both tanks carry extended air intakes for deep-wading operations.
U.S. Army Signal Corps · NHHC USA C-724 · Public domain · Source

M4 Sherman with deep-wading gear

Medium tank · 75 mm gun · deep-wading stacks · amphibious landing preparation

Armoured vehicles at Slapton were fitted and handled for landing through surf rather than normal road movement. Period photographs from the exercise area show Shermans with deep-wading equipment among the LST, LCT and engineering traffic on the beach.

The Cost

The naval attack has a firm total; the live-fire story requires more caution

Naval History and Heritage Command gives 749 American dead or missing from the E-boat attack: 551 Army and 198 Navy. Historic England records 202 losses from LST-507 and 424 from LST-531. Other deaths came from the damaged ships and the water.

The loss mechanism was unusually cruel. Men were trapped below decks, burned by fuel fires, drowned, or died from exposure. Some life belts were worn around the waist rather than high under the arms. In the water, that could pitch an exhausted man face-down instead of supporting his head.

Friendly-fire deaths during the wider rehearsal are harder to reconstruct. The timing error on 27 April is documented, but the US Army's recent review states that the heavy naval bombardment did not strike Company G. This page therefore does not attach a precise friendly-fire death total to that episode.

749

American dead or missing

The established NHHC accounting for the German S-boat attack on Convoy T-4.

Proposed by Naval History and Heritage Command

551

US Army dead or missing

Army component of the 749-person naval-attack total.

Proposed by Naval History and Heritage Command / Historic England

198

US Navy dead or missing

Navy component of the 749-person naval-attack total.

Proposed by Naval History and Heritage Command / Historic England

202

Lost from LST-507

Army and Navy personnel recorded lost from the ship after the torpedo strike and fire.

Proposed by Historic England, National Heritage List entry 1463496

424

Lost from LST-531

Army and Navy personnel recorded lost when the ship was hit twice and sank within minutes.

Proposed by Historic England, National Heritage List entry 1463495

Books & Relics

The authenticity of the relics is not verified by WW2 Theatres.

This collection is curated by WW2 Theatres and not affiliated with our website, with all site photographs licensed to their respective owners.

Sources & Archives

US Army operational records, US Navy history, protected wreck records and wartime photography

The land-side chronology follows Stephen A. Bourque's 2024 US Army study of the 4th Infantry Division's D-Day preparation, which draws on Barton papers, division records and VII Corps material. It is particularly useful for the 27 April timing change and for separating the documented training failure from later versions of the friendly-fire story.

The naval attack is checked against Naval History and Heritage Command accounts and Historic England's protected-wreck records for LST-507 and LST-531. Those records provide the casualty accounting, cargo detail and physical evidence from the wreck sites. Photographic captions and rights are taken from the individual Wikimedia Commons file pages.

  1. An Incredible Degree of Rugged and Realistic Training: The 4th Infantry Division's Preparation for D-Day, Stephen A. Bourque, 2024US Army University Press, Military Review
  2. Exercise Tiger: Disaster at Slapton SandsNaval History and Heritage Command
  3. H-029-1: The Exercise Tiger Debacle, 28 April 1944Naval History and Heritage Command
  4. Slapton Sands: The Cover-up That Never Was, Charles B. MacDonaldNaval History and Heritage Command
  5. USS LST-507, National Heritage List entry 1463496Historic England
  6. USS LST-531, National Heritage List entry 1463495Historic England
  7. Witnessing Exercise Tiger: USAAF Photos from April 1944Historic England Archive
  8. Operation Tiger Memorial PlaqueImperial War Museums, War Memorials Register
  9. D-Day rehearsal cph.3c32795Library of Congress / Wikimedia Commons
  10. Exercise TIGER operational and casualty recordsUS National Archives and Records Administration
Operation chronologyDates, locations and sourced event summaries
DateEventLocationSummary
Saturday 1 April 1944 · PlanningVII Corps begins planning TigerSouth-west England

Bradley directed J. Lawton Collins and VII Corps to prepare another full-scale rehearsal for the Utah Beach force during the last week of April.

Sources 1
Tuesday 18 April 1944 · PlanningBarton issues the division exercise orderDevon

The 4th Infantry Division staff prepared Field Order No. 1 for Exercise Tiger using the developing VII Corps Neptune plan as its guide.

Sources 1
Saturday 22 April 1944 · AssemblyMore than 30,000 men move toward the portsDevon embarkation area

Over 30,000 soldiers began moving into embarkation and assembly areas for the exercise.

Sources 1
Tuesday 25 April 1944 · MorningAssault troops practise the landingSlapton Sands

American assault troops came ashore on the Devon training beach while landing craft cycled between ships and shore.

Sources 1, 9
Wednesday 26 April 1944 · Support phaseThe beach becomes a supply baseSlapton Sands

The rehearsal continued with fuel, ammunition, vehicles and other sustaining units moving ashore behind the assault formations.

Sources 1
Thursday 27 April 1944 · 07:30The original H-hour survives in part of the forceSlapton Sands

The assault had originally been scheduled for 07:30. Rear Admiral Don Moon postponed it by one hour.

Sources 1
Thursday 27 April 1944 · 08:30The rescheduled bombardment beginsSlapton Sands

Naval gunfire began on the revised schedule while Company G was already ashore.

Sources 1
Thursday 27 April 1944 · AfternoonThe rehearsal exposes weak coordinationSlapton Sands

Barton and other senior officers found problems in unit leadership, movement and cooperation between the services.

Sources 1
Thursday 27 April 1944 · NightConvoy T-4 moves into Lyme BayStart Bay into Lyme Bay

Eight LSTs carrying follow-up troops, vehicles and supplies sailed in sections from Plymouth and Brixham and formed Convoy T-4.

Sources 2, 3, 7
Friday 28 April 1944 · About 01:30The S-boats find the convoyLyme Bay

Nine German S-boats from the 5th and 9th Schnellboot flotillas had left Cherbourg and moved into Lyme Bay.

Sources 2, 3, 4, 7
Friday 28 April 1944 · Just after 02:00LST-507 is torpedoedLyme Bay

A torpedo struck LST-507 around the auxiliary engine room, cutting electrical power and communications and starting fires among vehicles, fuel and ammunition.

Sources 2, 3, 5
Friday 28 April 1944 · About 02:15LST-531 is hit twice and sinksLyme Bay

Two torpedoes struck LST-531. Explosions and fire spread rapidly through a ship carrying hundreds of soldiers, naval personnel and live ammunition.

Sources 2, 3, 6
Friday 28 April 1944 · About 02:30LST-289 survives a torpedo hitLyme Bay

LST-289 was torpedoed and lost much of its stern, but the ship remained afloat and could still make headway.

Sources 2, 3, 5, 6
Friday 28 April 1944 · AttackThe LSTs fire back and scatterLyme Bay

Surviving LSTs used their 40 mm and 20 mm guns as the convoy broke formation and attempted to escape the torpedo tracks.

Sources 2, 3, 7
Friday 28 April 1944 · After the hitLST-507 is abandonedLST-507

Historic England records LST-507 as finally abandoned roughly thirty minutes after the torpedo strike.

Sources 5
Friday 28 April 1944 · Before dawnSurviving ships return for men in the waterLyme Bay

Ships that had escaped the attack began recovering survivors from the cold water as the immediate S-boat threat passed.

Sources 2, 3, 4
Friday 28 April 1944 · MorningThe scale of the loss becomes clearSouth Devon

The official accounting eventually reached 749 American dead or missing: 551 Army and 198 Navy personnel.

Sources 2, 3, 4, 5, 6
Saturday 29 April 1944 · AftermathMoon writes to CollinsPlymouth area

Rear Admiral Moon sent Collins a message expressing sympathy for the losses suffered by the 1st Engineer Special Brigade in their first contact with the enemy.

Sources 1
Sunday 30 April 1944 · LessonsTiger feeds back into the invasion planSlapton Sands

Exercise Tiger ended with a list of practical failures in communications, timing, convoy protection, rescue and beach organisation.

Sources 1, 2, 3, 7

Image rights. U.S. Army, U.S. Navy and other U.S. federal photographs are public domain where the individual Commons file records that status. Royal Navy official photographs are public domain under expired UK Crown copyright where stated on Commons. Bundesarchiv material is credited under CC BY-SA 3.0 DE. The PhotosNormandie Slapton Sands image is used under CC BY-SA 2.0. Navy Medicine material is used under the No Known Copyright Restrictions statement attached to its Commons file. Where an exact wartime portrait or exact photograph of a lost ship is unavailable, a directly related wartime image of the command, unit, ship class or weapon is used and identified explicitly in the caption.